Water Atlas logo SARASOTA COUNTY PROJECTS CATALOG

Project / Treatment: Dona Bay Phase 2

Project Type
Description Phase two of the Dona Project is the surafce water storage facitlity. This 370 acre wet detention surface storage lake helps to divert excess freshwater from flowing straight into Dona Bay as well as remove extra TN, TP, and TSS by increasing its retention time in the system. It can then reenter Cow Pen Slough and Salt Creek before moving into Dona Bay at a much slower rate.
Completion Date December 31, 2023
Comments

Click Map for a Large, Interactive Version

Pollution Reduction Estimates

Project / Treatment Load Reductions (lbs.)
TN (lbs/yr) TP (lbs/yr) TSS (lbs/yr) BOD Fecal coliform (%)
Dona Bay Phase 2 7,000