Project / Treatment: Datura Ditch Stream Restoration

Project Type Sediment Sump
Description Settlement will occur at the sumps located on both ends of the proposed slotted pipe. For smaller, lower intensity storms that will create flows as through the proposed conveyance at velocities lower than 2 feet per second.
Completion Date June 25, 2014
Comments Alligator Rest Project (W509) Dry retention removal eff. For TSS 85% ECFRPC(1978) -SW Treat Report

Site Photos

Click Map for a Large, Interactive Version

Pollution Reduction Estimates

Project / Treatment Load Reductions (lbs.)
TN (lbs/yr) TP (lbs/yr) TSS (lbs/yr) BOD Fecal coliform (%)
Datura Ditch Stream Restoration 2,209