Project / Treatment: Alligator Creek Treatment Trains

Project Type Brierwood Treament Facility/Wet Detention Pond
Description At the eastern end of Briarwood Road, at an abandoned wastewater treatment plant site, an innovative off-line treatment system will be constructed using continuously-operated recirculating pumps, settling, aerobic nitrification, anaerobic denitrification, wet detention ponds, up-flow adsorptive filtration through Suntree Bold and Gold (TM) media, and final reaeration to maximize nutrient removal and optimize benefits for receiving waters.
Completion Date February 14, 2013
Comments Watershed Manangement Model, Version 4.1 CDM Oct 98, Loadinf based on 2006 SWFMD aerial GIS Land Use Categories

Site Photos

Click Map for a Large, Interactive Version

Pollution Reduction Estimates

Project / Treatment Load Reductions (lbs.)
TN (lbs/yr) TP (lbs/yr) TSS (lbs/yr) BOD Fecal coliform (%)
Alligator Creek Treatment Trains 3,847 449 35,881