Project / Treatment:
Alligator Creek Treatment Trains
Project Type
Brierwood Treament Facility/Wet Detention Pond
Description
At the eastern end of Briarwood Road, at an abandoned wastewater treatment plant site, an innovative off-line treatment system will be constructed using continuously-operated recirculating pumps, settling, aerobic nitrification, anaerobic denitrification, wet detention ponds, up-flow adsorptive filtration through Suntree Bold and Gold (TM) media, and final reaeration to maximize nutrient removal and optimize benefits for receiving waters.
Completion Date
February 14, 2013
Comments
Watershed Manangement Model, Version 4.1 CDM Oct 98, Loadinf based on 2006 SWFMD aerial GIS Land Use Categories
Site Photos
Download PDF
Print
Click Map for a Large, Interactive Version
Pollution Reduction Estimates
ProjectID
Project / Treatment
Load Reductions
(lbs.)
TN
(lbs/yr)
TP
(lbs/yr)
TSS
(lbs/yr)
BOD
Fecal coliform
(%)
73
Alligator Creek Treatment Trains
3,847
449
35,881