Sarasota County Water Atlas


Home Metadata

Not Available

Metadata Summary for
Briarwood Stormwater Treatment Facility

Datasource Information
Dataset TypeMonitoring/Sampling Data
Name of Data SourceBriarwood Stormwater Treatment Facility
Number of Water Resources Sampled1
Datasource Abbreviation (dataset)SARASOTA_BSTF
Description of DatasourceThe Briarwood Stormwater Treatment Facility (BSTF) was completed in 2012 in Venice, FL. Designed to treat surface water from a 65-acre wet detention pond between storm events, the treatment train includes physical and biological processes to reduce nitrogen loads to Alligator Creek. Water quality parameters are monitored monthly at BSTF to provide estimates of pollutant load reduction efficiency and inform on optimal operations. The results of the removal of total nitrogen and select nutrients are reported annually in the Sarasota County NPDES MS4 Annual Report.
Method of Transferring Data to the AtlasNot Available
How Often Data is Transferred to the AtlasBi-Monthly
Date of Most Recent Data Transfer8/19/2025 5:00:12 AM
Period of Record Within the Atlas7/1/2020 - 7/21/2024
Disclaimer/Use ConstraintsNot Available
Custodian Information
Agency Name Sarasota County Environmental Services Department
Water Resource Management
Contact NameKayla Quinn
Contact Phone(941) 861-0940
Contact E-mailkquinn@scgov.net
Contact URL Not Available
Mapping
Analysis
Learn
Participate
An Edition of wateratlas.org
Connect With Us

The USF Water Institute is committed to ensuring that our websites conform with Accessibility Support guidelines for people who need to use assistive technologies. We are continually improving the user experience for everyone, and applying the relevant accessibility standards. View our Accessibility Statement for more information.