An edition of: WaterAtlas.org Presented By: Sarasota County, USF Water Institute
The Briarwood Stormwater Treatment Facility (BSTF) was completed in 2012 in Venice, FL. Designed to treat surface water from a 65-acre wet detention pond between storm events, the treatment train includes physical and biological processes to reduce nitrogen loads to Alligator Creek. Water quality parameters are monitored monthly at BSTF to provide estimates of pollutant load reduction efficiency and inform on optimal operations. The results of the removal of total nitrogen and select nutrients are reported annually in the Sarasota County NPDES MS4 Annual Report.
Pollutant Load Reduction Reports for the Briarwood Stormwater Treatment Facility are updated at least bi-monthly. These reports are generated utilizing water quality and flow data to calculate the estimated nitrogen load reductions for each month. The tables below contain the most recent 12 months of calculations. Reports are available for download for the entire period of record.